Tuesday, 29 April 2014

The DarkSide Ethos

I found this today on imgur and it pretty accurately describes the process most of my projects work from:


Buying is normally the last resort, either for something specific or to make use of something I already have. Engineering on a budget isn't easy!

Thursday, 27 March 2014

The Great living room shuffle.

[From the archive of things-I-didn't-get-round-to-posting-at-the-time]

Since i moved in nearly 4 years ago I've been moving the lounge around bit by bit trying to find the best use of space and as yet I've not really found anything which is satisfying. Its get better each time, but never really been "perfect"
The latest arrangement I did about 5 months ago and it almost exactly the opposite of what it was when i move in (at least for the TV/Sofa anyway) and works pretty well. But still isn't what I envisage or exactly right, but i guess its the best i'll get.

The TV unit got moved from the right-hand wall to the back wall of the house, but the window faces directly into the sun, so wasn't ideal.


The sofa sectioned off the bar/bookcases from the main lounge and really didn't help when there were more than a few people round. (shown mid move, it was normally further away from the back bookcases)


The dining table was against the wall, which was fine until it was used. You ended up eating facing a wall, with the only light source in the room behind you, eating in the shadows. Plus the chairs and table got in the way of the cupboard door.


One day, move ALL the things! The TV unit came apart as it was too big to fit where the table was without obstructing the door a lot so it was reduced in size (too much as it turns out, but i'll post about that another time)


The TV ended up where the Table was, the table went by the bar and bookcases and made a kind of dining area, and the sofa went on the opposite wall to the TV. The downside of this is that the TV is a long way from the sofa, and despite being 40" looks, dare I say, small. Pulling the sofa into the middle of the room means there's a lot of dead space behind it.

UPDATE:
Alas, since writing this and before it was fully sorted, (although much tidier and better laid out than this) It's come up that I'll likely have to move this year, so all of this is for nothing. Back to square one for somewhere new!

Slacking

With the year getting busier all my blog plans have started to lapse and updates are getting dropped in priority, even though it's just publishing them, I keep forgetting :(. I'll try and do a bit more next month and actually get back on track.

On the plus side, i've now had over 6,000 views. Maybe by the end of this year it'll be OVER NINE THOUSAND

For now, here's one I prepared earlier.

Wednesday, 19 March 2014

Berry Brew!

In the last couple of years of brewing I've done one batch which has involved pressing the fruit myself, which was also my first batch. It was really satisfying but due to the 2012 crop being quite poor on the whole I didn't get to do it. I also borrowed the press from some friends which was really useful, however this year they too had a good crop to work with so I couldn't get it as they were (understandably) using it.

So, after a lot of looking around and pondering, i bought my own. Of the three sizes, i bought the largest, most because the price difference and capacity were less than linear. the smallest of this design were 2/3 the price and 1/4 of the capacity, the next size up, barely £10 less and half the size. Didn't really seem like a sensible choice to get anything less than the largest.

Another investment was a pack of plain cotton pillow cases, cheap and they'll help keep much of the pulp from entering the juice. 


First up, the blackberries which the pillowcase prove invaluable for as there are SO many seeds and bits.


First press, starting gently.


The press made a pretty good cake of berry pulp, but it still felt fairly moist.


A quick blast in a pan broke them down a little and they gave up quite a bit more. In the end I got nearly half a gallon of juice from them alone.


Sure enough after another press, the result was much drier.


The abundance of juice meant almost 1/8th of the batch was blackberries and the rest apple, more than i'd expected, but in retrospect 1/4 or even 1/3 would have given a slightly better colour.

Tuesday, 11 March 2014

LAN In A Box - Part 6, Cables!

eBay is a funny thing, sometimes you get screwed over in what you receive, sometimes you get a lot more. I came back one day to find a package has arrived, about 4 feet long, no idea what it was, nothing i'd ordered was this kind of size and weight.

As it turned out, it was a pair of 3U rack rails i'd ordered from eBay the week before. Only they were slightly bigger, 30U in fact. So if anyone needs a couple of dozen U of rack rails, let me know! Here they are besides the Box they're supposed to fit inside...


After a little while with a hacksaw and file the rails were trimmed to a more reasonable 2U (I thought 3U would be too big, but gave enough extra to play around with). The left rail attaches to a pine uprights which screws to the base and the other to the side.


Here's a picture of the power and switch (which should probably have been in the previous post about power installation. The second 4-way was shortened substantially to neaten it all up.


The first runs of cable go in!


After what felt like an hour of threading cat5 cables, the first batch were tidied together with cable ties into a 4x4 bundle. It looks incredibly neat, but it's also an enormous pain to do in a small space.


Next comes patching and testing and more threading of cables. So many cables...

Tuesday, 18 February 2014

Extraction, it sucks.

The workshop where I do a good deal of the work on here has been in dire need of some better means of collecting the dust. There's a large shop-vac at one end, but the hose for it is just flex. The flex itself loses a lot of power and efficiency and generally gets in the way of every other machine down that side.

so, with the following pile of parts (and some drain pipe) a better solution is sought.


The intake to the machine is annoyingly on the furthest side from the machines, pointing to the window, not ideal so half of the parts are just to make this section to get the flow to the wall.


There's a pipe mounted in the wall which helped immensely to hold this first part in place and position the next section. The joining piece


Speaking of which, the next section is a single 3m length of drain pipe with T sections for two down pipes for the radial arm saw and the table saw. A shelf had to be cleared out to make space, but it was replaced with a wider one for all the same stuff to go back on to. no space lost fortunately.

The joining part between the two pieces will wait until the end in case things have to be shuffled around.


Similarly, the next piece goes around the garage door, working backwards towards the longest section above the shelf and work bench.


After that, the long section was extended around the corner and the ends connected with a rubber sleeve to account for the slight change in pitch.


The other end was done the same way and connected in to link all three parts.


The next parts to go in are two down pipes to lower the end to a workable height above the main bench and table saw, with a flat gate to block the holes not being used and improve suction. After that, another run down the other wall.

At one point the plan was to run two pipes in separate runes feeding into a Y shape at the vac end, instead a single loop should keep the flow of air smoother and if two tools are in use at once, the flow is unidirectional rather than being split and help keep the dust moving freely to the bag.

Thursday, 6 February 2014

LAN In A Box - Part 5

The next thing to tackle is the front and top of the box. Ideally this needed to be hinged in two places, but also lightweight enough to open easily and not add too much weight.

With that in mind, using 1/8" plywood keeps the weight down, but it has a reasonable amount of flex. Fixing piano hinge to the back keeps the whole length of the top piece supported, but fixing it isn't that simple as it's not got enough depth to screw into.


To get around it, pop rivets with washers at every hole hold it in place securely and stiffen the top of the back panel.


The front and top are hinged the same way before they're attached to the box itself. The downside of this method is that removing the 'door' is extremely difficult, but it shouldn't be necessary.


When the Box is in use the door needs to stay up, propped on the top edges as the cables will come through the front as the server and switch will need airflow.


The door also has a hole in the front to make opening it easier, Another 1" forstner hole is enough for the weight of the door.


And a couple of notches in the top stop the door sliding down onto the cables.


With airflow in mind, the back also needs to be cut for exhaust to allow air from the switch out and power and uplink cable ingress.


Once again, the router makes short work


Not much more to do now (at least not on the list anyway, many hours) and it'll be finished*
(* Finishing is neither guaranteed nor 100% likely to avoid a v2 being made)

Last job for this visit to the workshop is some wheels, this'll make it far easier to load into the car, as well as the cupboard.